1. Projekt: TETO Zagreb, 2015

Description: Suply of valves for construction of 750 MWh heat acumulator
Supplier: VISVANA
Specials: 26 valves where is asked PED and hidraulic low pressure test for closure – criterion A
Description: Project involves construction of heat acumulator which consists of: storage tank , pumping station, connecting pipes and system for control and management. The construction of a heat acumulator intended for the accumulation of heat in the method of storing hot water in the storage tank for the time when the need for hot water in the heating system, hot water is reduced. When needs for thermal energy increase, a portion of the required heat deliver from heat accumulator. Heat capacity of the battery is 750 MWh, 150 MW at 40°C difference between the temperature of the incoming and outgoing water. The pump station is intended as a stand-alone object where are installed following main equipment:
  • Pump for the heat discharge of the heat accumulator
  • Pump for regulating the temperature of the water which is charged heat accumulator
  • Main pipelines (hot pipelines)
  • Piping from the pump
  • Management system equipment
  • Electro-energy installations and equipment
  • Bridge crane with a movable trolley load of 100 kN
  • Refrigeration equipment for area where is installed management system equipment.
TETO Zagreb 1

TETO Zagreb 1

TETO Zagreb 2

TETO Zagreb 2

TETO Zagreb 3

TETO Zagreb 3

TETO Zagreb 4

TETO Zagreb 4

TETO Zagreb 5

TETO Zagreb 5

 
 

2. Projekt: HTZ, 2 drivers TES Blok 6, 2013

Description: Delivery of 2 drives for conveyors, who connecting Mine Velenje and TES
Suppliers:
  • Rossi, gear
  • Pintsch Bubenzer, disc brake
  • Transfluid, hydrodynamic coupling
Specials: Drives have ATEX II 2D/2G certificate
HTZ, 2 drivers TES Blok 6

HTZ, 2 drivers TES Blok 6 1

HTZ, 2 drivers TES Blok 6 2

HTZ, 2 drivers TES Blok 6 2

HTZ, 2 drivers TES Blok 6 3

HTZ, 2 drivers TES Blok 6 3

 

3.Projekt: Adriatic Gate – Rijeka, 2013

Description: Takeover and start test BUBENZER brakes in Adriatic Gate – Rijeka
Suppliers: Pintsch Bubenzer
Specials: Working brakes have installed newest monitoring system CMB2
Adriatic Gate – Rijeka

Adriatic Gate – Rijeka 1

Adriatic Gate – Rijeka 2

Adriatic Gate – Rijeka 2

Adriatic Gate – Rijeka 3

Adriatic Gate – Rijeka 3

 

4.Projekt: Merkur Naklo, 2005

Description: Supply of disc brakes for crane
Suppliers: Pintsch Bubenzer
Specials: /
Merkur Naklo

Merkur Naklo 1

Merkur Naklo 2

Merkur Naklo 2

Merkur Naklo 3

Merkur Naklo 3

 

5.Projekt: Mine Velenje, 2013

Description: Supply of multy-stage centrifugal pumps
Supplier: Düchting
Specials: The pumps are used for pumping pitmine water containing sand, coal dust, SO4, Cl, NH4, Na, HCO3- and are installed at level of -40.5 and -130. The pumps have ATEX I M2 certificates.
Mine Velenje

Mine Velenje 1

Mine Velenje 2

Mine Velenje 2

Mine Velenje 3

Mine Velenje 3

 

6.Projekt: Esotech, 2013

Description: Supply of multy-stage centrifugal pumps for TES blok 6
Supplier: Düchting
Specials: Pumps are used for flue gas desulphurisation and pumping water.
Esotech

Esotech 1

Esotech 2

Esotech 2

Esotech 3

Esotech 3

 

7.Projekt: Russia, 2013

Description: Suply of ELSO/ELBE cardan shafts for project Russia
Supplier: ELSO/ELBE
Specials: /
Russia

Russia 1

Russia 2

Russia 2

 

8.Projekt: HTZ, 2011

Description: Supply of brakes and gears for conveyor tensioners
Suppliers: Tüschen&Zimmermann and Flender
Specials: Tensioners are located on the conveyor belts, wherein the presence of coal dust and gases. They have ATEX I M2 certificate.
HTZ

HTZ 1

HTZ 2

HTZ 2

HTZ 3

HTZ 3

 

Education ... in agreement with the end-customers

1.Projekt: Mine Velenje

Description: Education and maintenance of electro-pneumatic brake BKG 900 PL/IFVÜ
Supplier: Tüschen&Zimmermann
Specials: Brakes are designed to operate in the harshest environments in the presence of both gas and coal dust. Meet all requirements of the ATEX I M2 norms.
Mine Velenje 4

Mine Velenje 1

Mine Velenje 5

Mine Velenje 2

Mine Velenje 6

Mine Velenje 3

 

2.Projekt: Port Koper, 2012

Description: Education and maintenance of electro-hydraulic brakes on container cranes
Supplier: Pintsch Bubenzer
Specials: Training is conducted in an active hoist and thus allow max support to service stuff.
Luka KP

Port Koper 1

Luka KP 2

Port Koper 2

Luka KP 3

Port Koper 3

 

3. Projekt: Acroni Jesenice, 2009

Description: Education and maintenance of electro-hydraulic brakes on cranes.
Suppliers: Pintsch Bubenzer
Specials: Training is conducted at various cranes and at the same time review of state of brakes.

4. Projekt: Mine Velenje, 2015

Description: Education and presentation of hydrodynamic couplings.
Suppliers: Transfluid
Specials: Presentation of the advantages and maintenance Transfluid couplings.

5. Projekt: Acroni Jesenice, 2008

Description: Education and project presentation EMG.
Supplier: EMG
Specials: Presentations and EMG solutions.